Home ยป HV Generation, Network Synchronisation & Grid Connection
![BT Energy 11kv Switchroom Project in Darwin Northern Territory Australia](https://0088e4.p3cdn1.secureserver.net/wp-content/uploads/2019/08/AdobeStock_54203717-web.png?time=1721997792)
HV Generation, Network Synchronisation & Grid Connection
Client:
Darwin International Airport, Northern Territory Airports
Location:
Darwin, Northern Territory, Australia
Size:
11kV Switch room
Status:
Active
Technology:
- 11kV Switch room
- Switch gear
- Data Control Systems
- Black start generation
- Uninterrupted Power Supply (UPS) Battery Systems